  "_note": "Curated post-2023-election OUTCOME overlay for the backtest (feature 5). Pre-election attributes (funding/risk/sector/cost/owner) come from the sourced pipeline.json dataset; this file ONLY adds (a) the documented post-election outcome and (b) where the current pipeline status differs from the Oct-2023 status, an explicit preElectionStatus — each with a public-record basis. No fabricated figures. Outcomes are well-reported decisions of the National-led coalition from Dec 2023 onward. 'stopped' = cancelled/scrapped; 'proceeded' = retained, advanced or under construction (note: several retained roads are advanced/committed, not yet built — see limitations).",
  "_sources": "RNZ, NZ Herald, Beehive.govt.nz ministerial releases, NZTA NLTP 2024-27, Government Policy Statement on land transport 2024.",
  "overrides": {
    "37": { "outcome": "stopped", "preElectionStatus": "Under Construction", "basis": "iReX Interislander mega-ferry project: Hyundai shipbuilding contract signed 2021, terminal works underway; cancelled by the incoming government in December 2023. A funded/contracted project that was stopped." },
    "8":  { "outcome": "stopped", "preElectionStatus": "Planning", "basis": "Let's Get Wellington Moving disestablished late 2023; mass transit and Mt Victoria tunnel components scrapped. Partly funded but stopped." },
    "51": { "outcome": "proceeded", "preElectionStatus": "Planning", "basis": "East-West Link reinstated as a Road of National Significance (RoNS) in National's 2023 transport policy / GPS 2024. Unfunded pre-election but retained/advanced." },
    "40": { "outcome": "proceeded", "preElectionStatus": "Planning", "basis": "Ara Tuhono Puhoi-Wellsford: Warkworth-Wellsford continuation retained in the RoNS programme; advanced post-election." },
    "5":  { "outcome": "proceeded", "preElectionStatus": "Planning", "basis": "Mill Road (Auckland) reinstated by National in 2024 after Labour cut it in 2021; included in RoNS." },
    "34": { "outcome": "proceeded", "preElectionStatus": "Planning", "basis": "Northland RoNS corridor (Whangarei / Brynderwyns) retained and prioritised in the RoNS programme post-election." },
    "59": { "outcome": "proceeded", "preElectionStatus": "Planning", "basis": "Waitemata Harbour Connections / second harbour crossing: National committed to advancing a second crossing (2024 announcement). Unfunded pre-election but retained/advanced." }
  }
}