Wellington Transport Package (2nd Mt Victoria Tunnel)
Waka Kotahi / Wellington City Council / Greater Wellington RC · Wellington
After cancelling the ~$7.4B Let's Get Wellington Moving programme (disestablished March 2024), the Government is advancing a roading-focused replacement: a second Mt Victoria tunnel, Basin Reserve upgrade and Terrace tunnel duplication — a ~$3.8B package being fast-tracked, with enabling works from 2026 and tolling proposed. Mass transit was dropped.
C
Breakdown▾
56% · Uncertain
Completion Probability — likelihood this proceeds on roughly its stated timeline.
Each axis is a scoring factor (0–100%)
Key facts
- Region
- Wellington
- Sector
- Transport
- Status
- Planning
- Estimated value
- $3.8b
- Indicative completion
- 2033
- Funding status
- Part Funded
- Lead organisation
- Waka Kotahi / Wellington City Council / Greater Wellington RC
- Election risk
- High
Election risk assessment
LGWM was disestablished in 2024; the roading-focused replacement (2nd Mt Victoria tunnel etc.) is government-fast-tracked but long-dated, and Wellington transport remains deeply contested.
Government priority alignment
MEDIUM — The PT-heavy LGWM was cancelled; the roads-focused replacement aligns better with GPS, though scope is contested.
Chronology
- 2018Let's Get Wellington Moving programme launched
- 2024LGWM disestablished (March); mass-transit and mega-tunnel scrapped
- 2025~$3.8B roading replacement announced — 2nd Mt Victoria tunnel, Basin Reserve, Terrace tunnel
- 2026NZTA progresses fast-track approvals; enabling works considered