Bay of Plenty — infrastructure exposure

4 tracked projects · $5.6b total pipeline value

4Projects
$5.6bTotal value
$3bAt election risk
72%Avg. probability

Projects by value

ProjectStatusValueCompletionScoreElection risk
Tauriko West & SH29 (Tauranga RoNS) Planning $3b 2033 D High
Tauranga Hospital Redevelopment Planning $1.2b 2034 C Medium
Tauranga Northern Link — SH2 to SH29 Under Construction $1.1b 2027 A Low
Tauranga City Centre Refresh Under Construction $320m 2026 A Safe
Sources & methodology. Project data from Te Waihanga's National Infrastructure Pipeline and public records. Completion Probability is a transparent heuristic (see https://nz-infrawatch.pages.dev/methodology/probability/). Approximations are flagged; no figures are fabricated. © 2026 NZ InfraWatch.