NZ InfraWatch
Infrastructure exposure report
Generated 2026-06-15
Hawke's Bay — infrastructure exposure
2 tracked projects · $2.3b total pipeline value
2Projects
$2.3bTotal value
$0mAt election risk
95Avg. probability
Projects by value
| Project | Status | Value | Completion | Score | Election risk |
| Hawke's Bay Cyclone Recovery — Infrastructure |
Under Construction |
$2.1b |
2026 |
A |
Safe |
| Napier Port — Wharf 6 Extension |
Under Construction |
$220m |
2025 |
A |
Safe |
Sources & methodology. Project data from Te Waihanga's National
Infrastructure Pipeline and public records. Completion Probability is a transparent heuristic
(see https://nz-infrawatch.pages.dev/methodology/probability/). Approximations are flagged; no figures are fabricated.
© 2026 NZ InfraWatch.