← Back to map
NZ InfraWatch
Infrastructure exposure report
Generated 2026-06-15

Hawke's Bay — infrastructure exposure

2 tracked projects · $2.3b total pipeline value

2Projects
$2.3bTotal value
$0mAt election risk
95Avg. probability

Projects by value

ProjectStatusValueCompletionScoreElection risk
Hawke's Bay Cyclone Recovery — Infrastructure Under Construction $2.1b 2026 A Safe
Napier Port — Wharf 6 Extension Under Construction $220m 2025 A Safe
Sources & methodology. Project data from Te Waihanga's National Infrastructure Pipeline and public records. Completion Probability is a transparent heuristic (see https://nz-infrawatch.pages.dev/methodology/probability/). Approximations are flagged; no figures are fabricated. © 2026 NZ InfraWatch.