National / Multi-region — infrastructure exposure

10 tracked projects · $39.3b total pipeline value

10Projects
$39.3bTotal value
$16.6bAt election risk
77%Avg. probability

Projects by value

ProjectStatusValueCompletionScoreElection risk
Local Water Done Well — National Programme Under Construction $15b 2034 B Extreme
Renewable Energy — Wind Farms (National) Under Construction $5.6b 2027 A Safe
Ministry of Education — School Property Programme Under Construction $4.8b 2028 B Medium
Transpower Grid Upgrades — National Under Construction $4.2b 2034 A Safe
KiwiRail — Rail Network Upgrades Under Construction $3.6b 2030 B Medium
Defence Estate Modernisation Planning $3.5b 2034 C Low
Accessible Streets — Cycling/Walking Programme — Cancelled Cancelled $900m TBC C Extreme
Whai Kāinga Whai Oranga — Māori Housing Under Construction $730m 2027 C High
School Redevelopment Programme — Budget 2026 Planning $600m 2030 B Low
State Highway Resilience Programme — Budget 2026 Under Construction $400m 2030 A Low
Sources & methodology. Project data from Te Waihanga's National Infrastructure Pipeline and public records. Completion Probability is a transparent heuristic (see https://nz-infrawatch.pages.dev/methodology/probability/). Approximations are flagged; no figures are fabricated. © 2026 NZ InfraWatch.