Waikato — infrastructure exposure
3 tracked projects · $3.9b total pipeline value
3Projects
$3.9bTotal value
$0mAt election risk
84Avg. probability
Projects by value
| Project | Status | Value | Completion | Score | Election risk |
| Cambridge to Piarere Expressway (Waikato RoNS) |
Under Construction |
$1.8b |
2031 |
A |
Low |
| Hamilton Bypass — Expressway Extension |
Planning |
$1.6b |
2030 |
C |
Medium |
| Waikato Expressway — Huntly to Longswamp |
Under Construction |
$520m |
2025 |
A |
Safe |
Sources & methodology. Project data from Te Waihanga's National
Infrastructure Pipeline and public records. Completion Probability is a transparent heuristic
(see https://nz-infrawatch.pages.dev/methodology/probability/). Approximations are flagged; no figures are fabricated.