NZ InfraWatch
Infrastructure exposure report
Generated 2026-07-01

Waikato — infrastructure exposure

4 tracked projects · $4.4b total pipeline value

4Projects
$4.4bTotal value
$0mAt election risk
86%Avg. probability

Projects by value

ProjectStatusValueCompletionScoreElection risk
Cambridge to Piarere Expressway (Waikato RoNS) Under Construction $1.8b 2031 A Low
Hamilton Southern Links Planning $1.6b 2030 C Medium
Te Rahui Solar Farm — Rangitāiki Under Construction $700m 2027 A Low
Tauhei Solar Farm — Te Aroha West Under Construction $300m 2026 A Low
Sources & methodology. Project data from Te Waihanga's National Infrastructure Pipeline and public records. Completion Probability is a transparent heuristic (see https://nz-infrawatch.pages.dev/methodology/probability/). Approximations are flagged; no figures are fabricated. © 2026 NZ InfraWatch.