Waikato — infrastructure exposure

3 tracked projects · $3.9b total pipeline value

3Projects
$3.9bTotal value
$0mAt election risk
84Avg. probability

Projects by value

ProjectStatusValueCompletionScoreElection risk
Cambridge to Piarere Expressway (Waikato RoNS) Under Construction $1.8b 2031 A Low
Hamilton Bypass — Expressway Extension Planning $1.6b 2030 C Medium
Waikato Expressway — Huntly to Longswamp Under Construction $520m 2025 A Safe
Sources & methodology. Project data from Te Waihanga's National Infrastructure Pipeline and public records. Completion Probability is a transparent heuristic (see https://nz-infrawatch.pages.dev/methodology/probability/). Approximations are flagged; no figures are fabricated. © 2026 NZ InfraWatch.